The post How to Use Life-Cycle Dynamic Simulation to Optimize Process Plant Operations first appeared on the ISA Interchange blog site.
The oil and gas production explosion is driving the renaissance of the chemical and process industries. With low-cost natural gas comes low-cost feedstock for many chemical compounds, in the form of ethane, propane, and butane, economically boosting the chemical industry. The American Chemistry Council released a report predicting capital investment of $72 billion in more than 100 new chemical plant projects through 2020 in North America alone. The report claims this investment will result in 500,000 additional jobs, many in plant operations.
In spite of all this good news, operations managers at process plants have greater challenges than ever before. Worker safety, environmental stewardship, process uptime, and conservation of plant resources have been common goals for plant operations for the past several decades. In addition to these goals, new challenges are stretching the limits of plant operations.
The challenges are real and must be addressed. The good news is that life-cycle dynamic simulation, the virtual plant, is an available, proven technology to help plant operations address these challenges.
Who is going to run the process plant of the future? The term “demographic time bomb” describes the upcoming crisis in the process industry in finding experienced operations personnel. The U.S. Department of Labor reports the average age of energy industry workers is older than 50, and half the current workforce (more than 500,000 workers) is expected to retire over the next five to 10 years. As these experienced operators leave industry, they take with them an irreplaceable amount of knowledge and experience. Although older operators came from a predigital age and relied upon mechanical skills and experience, younger operators, in general, have fewer mechanical skills, but are adept at using technology at their jobs. The operators of the past, who could diagnose compressor health by sound, are being replaced by a new generation more comfortable behind a computer display.
How long does it take to develop a competent operator? A study from the Oil and Gas Journal states that it takes, on average, seven years for new workers to achieve a competence level to make or recommend appropriate risk decisions. These seven years conflict with the average worker’s expectation of staying only five years in one position. This means that in many process plants, members of the operations staff are looking for their next positions before they become competent in their current roles.
Petrochemical and energy plants have already been compromised by their lack of qualified operators. A fertilizer plant in the Midwest claimed if it lost one more experienced operator, it might not be able to run the plant. It was one good operator away from plant closure.
Can we apply automation to address this challenge? Well, the lack of operations experience makes the role of process automation critical to success. Modern automation technology has an excellent return on investment; it can be used to operate process plants with fewer qualified operators. Highly automated plants also have fewer operations-related errors. Modern control systems are very advanced and can handle many tasks quicker, safer, and at a lower cost than a human operator can. And advances in automation system and process technology allow process plants to operate longer without downtime.
However, in a highly automated plant, the role of the operator is different and more difficult. The operator now has to monitor a sophisticated system and make decisions about the health of the process and the performance of the system based on information from the operator console. With the industry trend to remove the operator from the dangerous process area, the control room operator station becomes the only window to the process in many plants.
Also, because the system and process are more reliable, operators may seldom or never see upset conditions. They can quickly lose critical skills necessary to deal with those situations. This often causes compromised operating conditions. Studies show that the greatest cause of operational loss in the process industries is due to operator error.
A virtual “private cloud” implementation brings the greatest benefits of security, accessibility, and ease of use. The example shown includes a dynamic simulation virtual server providing I/O and process simulation, offline control system virtual workstations, and a hypervisor management virtual appliance.
Should we automate these new processes? Of course, investment in automation and new technology is critical to meeting the goals of these process investments. However, there are risks in automation projects. Although modern process automation systems have great reliability and performance, the risks introduced by human engineering and operations still remain. These risks are:
In addition, government bodies continue to pressure process plants to document their efforts to administer a safe and effective operations environment. Initiatives like the OSHA National Awareness Program require operations management to prove adherence to standard operating procedures, control system standards, and other plant operation documentation. Insufficient evidence to due diligence can result in fines or citations.
None of us would want to get on an airplane with a pilot who is not trained. Why would we want someone to run our plants without proper training? To prepare a commercial airline pilot to operate a new airplane, weeks of training in a flight simulator is mandated, as well as hours of instruction and study. Shouldn’t process plant operators have the same time of preparation before managing complicated processes?
Consider that a typical pilot has more than 100 variables to manage from the cockpit. It is not unusual for a process plant operator to manage more than 1,000 variables from one control room console.
So, is there any evidence to the value of dynamic simulation? In a survey of users of dynamic simulation by World Oil Online, users reported an average increase in operator effectiveness of 31 percent. The same survey attributed an average total savings of $15.3 million from the use of the simulator. The value of using dynamic simulation has been proven time after time, but not everyone who would benefit from one is using one
Why don’t all process plants use a dynamic simulator? For one thing, the solutions traditionally offered in the industry are difficult to use and require extensive customization. Traditional approaches to dynamic simulation have made system maintenance a nightmare. In that same World Oil Online survey, 52 percent of the respondents said that they seldom or never updated their simulator. The investment to update traditional approaches to dynamic simulation can be significant.
Finally, these traditional solutions are seldom built to support automation system and operational improvement. But this application can be just as important as operator training. Most dynamic simulation systems are justified as an operator training system. However, if a life-cycle dynamic simulation approach is followed, issues are uncovered in the automation system or operation of the plant that could be catastrophic when operating the plant.
A recent life-cycle dynamic simulation showed a major operational issue on a chemical process in the Houston area that has been running for nearly 20 years. The plant was designed so it could conduct maintenance and improvements without shutting down, eliminating the need for a cold start. At the same time, the plant experienced a high turnover in operators and needed to validate its start-up procedures. A dynamic simulation of the plant allowed the organization to verify all standard operating procedures, including the cold startup. None of the operators could start the plant in the simulator. The plant engineering team found significant automation issues keeping them from starting up the plant. The dynamic simulator allowed them to correct the control system and verify the start-up procedures.
In most cases, the benefits from automation and operational improvements are the same or greater than the benefits from an operator training system. Training operators and making automation changes on the running plant are costly and dangerous. A better approach to applying the benefits of dynamic simulation offers hope for plant operations.
The better approach is investing in a life-cycle dynamic simulator or virtual plant. The exact same operator graphics, alarms, and controls used in the online control system are copied into a control system simulator made by the control system vendor. The operator works on an exact replica of the system in the control room, and the organization uses a real-time, dynamic model of the I/O and process to provide I/O signals to the simulated control system. The operator and control system appear to be controlling the actual process. Finally, the entire solution is implemented in a virtual, private cloud environment.
The investment in a virtual plant brings excellent returns for the life-cycle operation of the process plant. In addition, by using the virtual plant for capital projects, companies can realize additional business benefits. A life-cycle approach provides value across all aspects of running a process plant, including safety, environment, regulations, operator training, and process optimization.
The life-cycle approach to dynamic simulation provides the greatest benefits to process plant operators, from operator training to control system performance and operational improvement. With the pressure mounting on process plant operations, it is time to use this effective technology to address the challenges faced by the industry.
The investment in life-cycle dynamic simulation provides excellent returns for the life-cycle operation of the process plant. Best-practice use of the virtual plant improves all aspects of successful operation of the process, including safety, environment, regulations, training, and unit optimization.
A version of this article originally was published at InTech magazine.
Source: ISA News